当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:详细的测量工作(表8)包括:1)建立测量控制;2)地形测量;3)地质调查;4)地质剖面图;5)电法测量;6)准备所有地下工程的平面图和剖面图;7)对矿体、含金蚀变带、巷道顶板(顶壁)及底板系统采样;8)近地表的槽探;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
详细的测量工作(表8)包括:1)建立测量控制;2)地形测量;3)地质调查;4)地质剖面图;5)电法测量;6)准备所有地下工程的平面图和剖面图;7)对矿体、含金蚀变带、巷道顶板(顶壁)及底板系统采样;8)近地表的槽探;
问题补充:

  • 匿名
2013-05-23 12:21:38
Detailed measurements (Table 8) include: 1) the establishment of measurement and control; 2) topographic survey; 3) Geological Survey; 4) geological section; 5) power measurement; 6) to prepare the plan and profile of all underground works; 7) on the ore body, gold-bearing alteration zone, the tunne
  • 匿名
2013-05-23 12:23:18
detailed measurements (table 8) include: 1) a measure to control; 2) topographic survey; 3) geological survey; 4) geological cross section; 5) Power Law; 6) preparation of all underground works the floor plan and drawing; 7) the ore body, alterations, and alleyways with top plate (top panel) and bac
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Detailed of measurement work (table 8) including: 1) established measurement control; 2) terrain measurement; 3) geological investigation; 4) geological profile Figure; 5) electric law measurement; 6) prepared all underground engineering of plane figure and profile Figure; 7) on orebody, and contain
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭