|
关注:1
2013-05-23 12:21
求翻译:一层甲类区域(调试室等)以及二层各功能办公车间,新风集中引入,通过热交换效率≥60%的全热交换器,再经过组合式空调箱处理之后送到各区域。是什么意思?![]() ![]() 一层甲类区域(调试室等)以及二层各功能办公车间,新风集中引入,通过热交换效率≥60%的全热交换器,再经过组合式空调箱处理之后送到各区域。
问题补充: |
|
2013-05-23 12:21:38
Layer CPI region (debug room, etc.) as well as various functions of the two-story office workshop, new wind focus on the introduction of heat exchange efficiency ≥ 60% of the heat exchanger, and then sent to the regional after a modular air conditioning box processing.
|
|
2013-05-23 12:23:18
Such an area (A), a layer (Debug room and so on) as well as Layer 2 features work shop, the new air-focused introduction through the heat exchanger efficiency, and ≥ 60% of the heat exchanger, and then a combined air-conditioning processes to the regional.
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
A layer of class a regional (debug room, etc), as well as the second floor all feature workshops, fresh air focus introduced, through the heat exchange rate ≥ 60% heat exchanger, and then through the modular air handling unit after processing to the regions.
|
|
2013-05-23 12:28:18
An armor class region (debugging room and so on) as well as two various functions work workshop, the new atmosphere centralism introduction, through the heat change efficiency ≥60% entire heat interchanger, after passes through again combined air conditioning box processing delivers various regions.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区