当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The catchments area, run-off coefficient, hydraulic slope, design flood discharge and water elevation for the appropriate return period shall be determined for each drainage structure. Cross-sections and gradients of watercourses shall be surveyed to determine the proper drainage, erosion protection of the structure an是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The catchments area, run-off coefficient, hydraulic slope, design flood discharge and water elevation for the appropriate return period shall be determined for each drainage structure. Cross-sections and gradients of watercourses shall be surveyed to determine the proper drainage, erosion protection of the structure an
问题补充:

  • 匿名
2013-05-23 12:21:38
集水面积,径流系数,水力坡降,设计泄洪和水海拔相应的回报期,应当认定为每个排水结构。水道的横截面和梯度应进行调查,以确定适当的排水系统,结构和斜坡的侵蚀保护。
  • 匿名
2013-05-23 12:23:18
该区域、径流系数、液压斜坡,设计的排洪和水的高度适当的回报期均应确定每个排水结构。 跨章节的水道和梯度应进行调查,以确定适当的排水、土壤侵蚀保护结构和斜坡。
  • 匿名
2013-05-23 12:24:58
catchments区域、决赛系数、水力倾斜、设计洪水放电和水海拔为适当的回归期间为每个排水设备结构将是坚定的。 河道横断面和梯度将被勘测确定适当的排水设备、结构的侵蚀保护和倾斜。
  • 匿名
2013-05-23 12:26:38
流域面积,径流系数,液压斜坡、 设计洪水流量和水高程为相应的返回期间,须为每个排水结构。剖面和梯度的水道须调查以确定适当的排水、 结构及边坡冲刷防护。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭