当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:当开挖进尺为80m时,仅有尾水洞3和4与主厂房连通,而尾水洞1和2还未与主厂房连通。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
当开挖进尺为80m时,仅有尾水洞3和4与主厂房连通,而尾水洞1和2还未与主厂房连通。
问题补充:

  • 匿名
2013-05-23 12:21:38
When the excavation footage for 80m, only the tailrace tunnel 3 and 4 connected with the main plant, tailrace tunnel 1 and 2 are not yet connected to the main plant.
  • 匿名
2013-05-23 12:23:18
When digging out footage of 80 m, only tail water hole 3 and 4 with the main plant, while the last water hole 1 and 2 have not yet connected to the main plant.
  • 匿名
2013-05-23 12:24:58
When excavates the ruler is 80m, only has a water tunnel 3 and 4 and the main workshop connect, but tail water tunnel 1 and 2 also not with main workshop connect.
  • 匿名
2013-05-23 12:26:38
When the excavation of footage is 80m, the tailrace tunnel only 3 and 4 main building and connected, and tailrace tunnel 1 and 2 is not the main plants connected.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭