求翻译:针对T梁吨位不大、预制周期短、运输难度大,以及对各基础承载力要求高的特点,结合梁场实际地质情况,制、存梁台座基础采用扩大基础和换填级配碎石分层碾压进行加固是什么意思?

待解决 悬赏分:1 - 离问题结束还有
针对T梁吨位不大、预制周期短、运输难度大,以及对各基础承载力要求高的特点,结合梁场实际地质情况,制、存梁台座基础采用扩大基础和换填级配碎石分层碾压进行加固
问题补充:

  • 匿名
2013-05-23 12:21:38
Tonnage is not for T-beam, prefabricated short cycle, transport is difficult, and capacity requirements based on the characteristics of high beam field with the actual geological conditions, the system, deposit base beam pedestal base and expand the use of graded gravel for fill points reinforcement
  • 匿名
2013-05-23 12:23:18
Little against T Leung tonnage, prefabricated cycles are short, transportation difficulties, as well as to the basis for high endurance Leung combines the features the actual geological conditions, systems, and deposited with Mr LEUNG's Foundation block used broadened basis for different levels and
  • 匿名
2013-05-23 12:24:58
In view of T the Liang tonnage not big, the prefabricated cycle short, the transportation difficulty is big, as well as requests the high characteristic to various foundations supporting capacity, the bond beam field actual geology situation, the system, to save the Liang pedestal foundation to use
  • 匿名
2013-05-23 12:26:38
For small precast t-beam tonnage short, transportation is difficult, as well as on the characteristics of Foundation bearing capacity of high requirements, combined the beam field geology, and stock beam support Foundation of spread Foundation and replacement of graded broken stone layer of rolled r
  • 匿名
2013-05-23 12:28:18
Tonnage is not for T-beam, prefabricated short cycle, transport is difficult, and capacity requirements based on the characteristics of high beam field with the actual geological conditions, the system, deposit base beam pedestal base and expand the use of graded gravel for fill points reinforcement
 
 