当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:通过德国某风电数据和某10机系统算例,比较了制定日前计划时使用不同的机组组合模型和风电功率预测信息的不同优化效果,验证了基于本文提出的场景法的随机机组组合模型能有效应用于含大规模风电场的电力系统日前调度中。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
通过德国某风电数据和某10机系统算例,比较了制定日前计划时使用不同的机组组合模型和风电功率预测信息的不同优化效果,验证了基于本文提出的场景法的随机机组组合模型能有效应用于含大规模风电场的电力系统日前调度中。
问题补充:

  • 匿名
2013-05-23 12:21:38
Germany, a wind power data and a 10-machine system operator cases, and compare the development of recently planned to use different the unit combination of model and wind electric power prediction information of the different optimization effect, verify that a proposed based on this article scenes m
  • 匿名
2013-05-23 12:23:18
Through the German wind power a data and a 10 examples, the system has been developing a plan before you use a different unit model and wind electric power combination forecast information of different optimization results, based on the Law of the scene presented in this paper the random combination
  • 匿名
2013-05-23 12:24:58
Through the German some wind electricity data and some 10 machine system example, planned on the other day when have used the different unit compared with the formulation to combine the model gentle breeze electric power forecast information the different optimized effect, confirmed the scene method
  • 匿名
2013-05-23 12:26:38
Through Germany in a wind turbine data and a 10 machine system for example, when you compare the formulation of plans the other day using a different unit commitment models and wind power forecasting information of different optimizations, validation of scenes based on this law applied stochastic un
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭