求翻译:三、 按照组装方案,现已进行到3.5步,另已组装完成的3.7步中的两根立柱无需拆除,直接进入3.6步进行横梁及拉筋管的组装,吊装前需安装完成脚手架;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
三、 按照组装方案,现已进行到3.5步,另已组装完成的3.7步中的两根立柱无需拆除,直接进入3.6步进行横梁及拉筋管的组装,吊装前需安装完成脚手架;
问题补充:

  • 匿名
2013-05-23 12:21:38
, In accordance with the assembly program, now in progress to Step 3.5, and the other has been assembled to complete the 3.7 step two column without removing it directly into the 3.6-step beam and stretching tube assembly, before the installation is complete lifting scaffolding;
  • 匿名
2013-05-23 12:23:18
In the Group 3 * , the program is being conducted to further to 3.5 and the other has assembled in Step 3.7 of the standard without the need to remove the root, and go directly to step 3.6 for beams and stretch out the group, you need to install before lifting complete scaffold;
  • 匿名
2013-05-23 12:24:58
Third, According to the assembly plan, already carried on to 3.5 steps, has in addition assembled 3.7 step two columns which completes not to need to demolish, enters directly 3.6 steps carries on the crossbeam and braces the tube assembly, in front of the hoisting must install completes the scaffol
  • 匿名
2013-05-23 12:26:38
Three, in accordance with the Assembly programme, have been carried out to 3.5 steps, has assembled two column 3.7 step without dismantling, direct access to 3.6 step beams and Assembly of pipes, lifting scaffolding before installation is complete;
  • 匿名
2013-05-23 12:28:18
workers' uniforms must be well equipped. ;
 
 