求翻译:夹套部分试压参照《GB50235—2010工业金属管道工程施工规范》里的4.2.8 夹套阀门的夹套部分应采用设计压力的 1.5 倍进行压力试验。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
夹套部分试压参照《GB50235—2010工业金属管道工程施工规范》里的4.2.8 夹套阀门的夹套部分应采用设计压力的 1.5 倍进行压力试验。
问题补充:

  • 匿名
2013-05-23 12:21:38
The jacketed part of the pressure test with reference to the jacket part of "gb50235-2010 industrial metal pipe construction norms" 4.2.8 jacket valve should be 1.5 times the design pressure of the pressure test.
  • 匿名
2013-05-23 12:23:18
Pressure Test CLIP part GB 50,235 - with reference to the 2010 industrial metal piping construction standardizing on the 4.2 8 valve set the folder folder set of parts should be in 1.5 times the design pressure a pressure test.
  • 匿名
2013-05-23 12:24:58
The clamp cover partial hydrostatic testing refer to "GB50235-2010 Industry Metal Plumbing engineering Construction Standard" in 4.2.8 clamp cover valve clamp cover part to be supposed to use the design pressure 1.5 times to carry on the pressure test.