当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2.1如图2所示,确认GIS与变压器间隔的电缆套管连接处A、B、C点断开,出线套管a、b、c、d、e、f、g点处的引流线也要确认在未连接状态;确认GIS中的所有PT、避雷器与GIS未连接,所有GIS气室均密封完好,且充合格的SF6,气体压力满足试验要求。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2.1如图2所示,确认GIS与变压器间隔的电缆套管连接处A、B、C点断开,出线套管a、b、c、d、e、f、g点处的引流线也要确认在未连接状态;确认GIS中的所有PT、避雷器与GIS未连接,所有GIS气室均密封完好,且充合格的SF6,气体压力满足试验要求。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
2.1 as shown in Figure 2, confirmed GIS and transformer gap cable tube attachment point A, B, C separate, goes beyond a line drive pipe a, b, c, d, e, f, g place direct the streamline also to have to confirm in the connection condition; Confirmed in GIS all PT, the arrester and GIS have not connecte
  • 匿名
2013-05-23 12:26:38
2.1 as Figure 2 by as shown in the, confirmed GIS and transformers interval of cable casing connection Department a,, and b, and c points disconnect, outlet casing a,, and b, and c, and d, and e, and f, and g points Department of introduction streamline also to confirmed in is not connection state;
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭