求翻译:The building design is subject to the update in the part referring to the land development plan and the architectural-construction part. All decisions related to the project have been attached to ToR, so that contractors, while designing the technical solutions they offer, were aware in which scope the administrative d是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The building design is subject to the update in the part referring to the land development plan and the architectural-construction part. All decisions related to the project have been attached to ToR, so that contractors, while designing the technical solutions they offer, were aware in which scope the administrative d
问题补充:

  • 匿名
2013-05-23 12:21:38
建筑设计是指土地开发规划和建筑施工部分的部分更新。与项目有关的所有决定都受到重视与tor,使承建商,而他们提供的技术解决方案设计,都知道在这范围的行政决定的变化将是必要的,使他们能正确估计为执行合同所需要的时间。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
大厦设计是受更新支配在提到开辟旷野计划和建筑建筑part.的零件。 所有决定与项目有关附有了突岩,因此承包商,当设计技术解答他们时提供,知道在哪个范围行政决定变动是必要的,因此他们能估计为合同施行适当地的需时。
  • 匿名
2013-05-23 12:26:38
建筑设计有中提到的土地发展计划的部分和建筑施工部分的更新。与项目有关的所有决定已都附加到 ToR,以便承建商,同时设计的技术解决方案,它们提供,都知道哪个范围行政决定更改将是必要的以便他们可以估计正确合同执行所需的时间。
  • 匿名
2013-05-23 12:28:18
建造设计在指的是陆地发展计划和建筑建造部分的部分中取决于更新。所有决定与项目相关附属于了 ToR,以便承包商,当设计他们提供的
 
 